Severity: Warning
Message: fopen(/tmp/pupr_clssess_3v1kgdq6d6g4ipv5uad9kobbi656e1f3): Failed to open stream: No space left on device
Filename: drivers/Session_files_driver.php
Line Number: 178
Backtrace:
File: /var/www/bungopos.com/application/controllers/Berita.php
Line: 7
Function: __construct
File: /var/www/bungopos.com/index.php
Line: 321
Function: require_once
Severity: Warning
Message: session_start(): Failed to read session data: user (path: /tmp)
Filename: Session/Session.php
Line Number: 143
Backtrace:
File: /var/www/bungopos.com/application/controllers/Berita.php
Line: 7
Function: __construct
File: /var/www/bungopos.com/index.php
Line: 321
Function: require_once
TRANS SUMATERA : Jalan tol yang dibangun oleh PT Hutama Karya (Persero)
JAMBI, bungopos.com - PT Hutama Karya (Persero) atau HK mengajukan permintaan penyertaan modal negara (PMN) senilai Rp13,87 triliun dari Anggaran Pemerintah dan Belanja Negara (APBN) Tahun Anggaran 2025.
Direktur Utama HK Budi Harto mengatakan, PMN untuk menyuntik modal anak usaha HK yang mengerjakan Jalan Tol Trans Sumatera (JTTS), yakni ruas jalan tol Jambi-Pekanbaru. Dia mengungkapkan, PMN itu untuk mengerjakan tiga proyek yang ditugaskan pemerintah kepada HK.
“Permohonan PMN tahun anggaran 2025 untuk Hutama Karya sebesar Rp13,87 triliun yang akan dialokasikan untuk ruas jalan Tol Jambi-Rengat, ruas Jalan Tol Rengat-Junction Pekanbaru, dan perencanaan teknis JTTS tahap III,” ujar Budi saat rapat di Gedung DPR, Senin (8/7/2024).
Dari PMN Rp13,87 triliun, kata Budi, sebanyak Rp7,62 triliun akan digunakan untuk ruas Tol Jambi-Rengat. Kemudian, Tol Rengat-Junction Pekanbaru akan menghabiskan dana Rp5,85 triliun, dan terakhir untuk perencana teknis JTTS tahap III Rp 400 miliar. (***)
Alamat: Graha Pena Jambi Ekspres,
Jl. Kapt. Pattimura No. 35 KM. 08
Kenali Besar, Kec. Alam Barajo, Kota Jambi
E-Mail: bungoposonline@gmail.com